Footbridge over the Bourges

Type of work
  • bridge and footbridge
Summary
Image
Image
1
2

Construction of a double-girder footbridge with tubular cladding. Assembled on the ground and installed by crane. Length: 67 m divided into 3 spans.

Type of service
  • Architectural metalwork
  • Flooring
  • Lighting
  • Metal framing
Stakeholder(s)
  • Gagne

Project owner

Famille Missionnaire de Notre Dame

Project manager

SARL d'Architecture Hubert Tallon

Architect

SARL d'Architecture Hubert Tallon

Location

Saint Pierre de Colombier (07)

Country

France

Date of delivery

2019-2020

Time of work

14 months

Amount of work

1 200 000 €

Market

Separate lots

Steel tonnage

82 tonnes