Construction of the main structure: mixed wood/concrete floor, laminated timber or CLT roof deck, mixed wood/metal lattice girder footbridge. Timber-framed mantle wall.
Biosourced label.
Nort sur Erdre High School
Type of work
- School
Summary
1
4
Type of service
- Facade / wooden cladding
- Flooring
- Laminated timber framing
- Metal framing
Stakeholder(s)
- Briand Bois
- Leroux
Project owner
Région des Pays de la Loire, Nantes (44)
Project manager
AIA Architectes
Location
Nort sur Erdre (44)
Country
France
Date of delivery
2019-2020
Time of work
1 year
Surface built
19 490 m²
Market
Separate lots
m3 Wood
670 m³