Bois Lilas office building

Type of work
  • Tertiary
Summary
Image
Image
Image
Image
1
4

Infrastructures up to ground floor level 1 in concrete. Structure of upper levels in glued laminated timber posts, PRS steel beam, stabilised CLT timber floor on full-height concrete cage. Timber-framed mantle walls with integrated joinery and BSO.

Le Bois Lilas is a hybrid construction combining different materials to meet the requirements of a timber building. Wood, of course, is used for the facades, posts and floors. Concrete is used only for the infrastructure, to guarantee the strength of the foundations. The use of steel completes the composition of the structure with very rigid long-span beams, creating large office spaces.

Type of service
  • Carpentry
  • Covering
  • Flooring
  • Laminated timber framing
  • Timber frame wall
Stakeholder(s)
  • Briand Bois
  • Leroux

Project owner

Lamotte constructeur

Project manager

Batitech

Architect

Herault Arnod architectures

Location

Saint Jacques de la Lande (35)

Country

France

Time of work

1 year

Amount of work

5 600 000 €

Surface built

7 000 m²

Market

Building envelope

Steel tonnage

25 tonnes

m3 Concrete

3 516 m³
Our locations

By your side

We work through a territorial network of proximity to provide quality service and responsiveness to our customers according to the local specificities, customs and habits of the territories where we are located. Contact one of our offices by clicking on the map.

Have a project?